Projects | Location | Date |
---|---|---|
Eng. Felix de los Ríos (Los Dos Cerritos) Water Reservoir | Lara | 1973 |
Onia Dam | Mérida | 1976 |
Atarigua Dam | Lara | 1979 |
Las Palmas Water Reservoir | Zulia | 1979 |
Bocono Dam | Portuguesa | 1982 |
Yacambu–Quibor System. Eng. Jose Maria Ochoa Pile Water Reservoir | Lara | 1982 |
Masparro Dam | Barinas | 1984 |
Raul Leoni Dam, Guri | Bolívar | 1985 |
Cuira River Dam | Miranda | 1986 |
Peña Larga Hydroelectric Center | Barinas | 1987 |
El Diluvio Dam | Zulia | 1989 |
Central Regional System. El Pao–La Balza pumping stations | Cojedes | 1995 |
Francisco de Miranda Hydroelectric Center,Caruachi | Bolívar | 2003 |
Fabricio Ojeda Hydroelectric Center, La Vueltosa | Mérida | 2013 |
Hydraulic Infrastructurecrcc232020-08-11T19:39:41-04:00