| Projects | Location | Date |
|---|---|---|
| Lining pipe for Masparro river discharge tunnel | Barinas | 1982 |
| Peña Larga Hydroelectric Center | Barinas | 1983 |
| SAAM Project, Construction works for the Carenero–Guatire polyduct | Miranda | 1986 |
| El Pao–Las Balsas pumping stations | Cojedes | 1992 |
| Uracoa Field, Monagas South Unit, miscellaneous projects: UM1 and UM2 stations, scrubber, treatment heater, firefighting system, truck unloading site, 16”gas pipeline, filtering unit, compressors, water-oil station, dehydrator, free water skimmer, barge loading dock, 40,000 bpd water treatment train | Monagas | 1998 |
| Monagas South Unit, miscellaneous projects: demounting, mobilizing, and remounting the V-104C treater and the FWKO V-164A skimmer | Monagas | 2018 |
Mechanical Mountingcrcc232020-08-11T20:05:15-04:00








